Calculation
230
Your Quantity
Rate by
One layer brick flat soling in foundation or in floor.(100 sft)
Material | quantity | Unit | Rate | Amount |
---|---|---|---|---|
Bricks | 300.00 | Nos | 14.17 | 4251 |
Fine Sand | 5.00 | cft | 0 | |
Masson (Civil) | 0.25 | person | 770.00 | 192.5 |
Skill Labour (civil) | 1.00 | person | 660.00 | 660 |
Miscellaneous (taka) | 100.00 | LS | 1.14 | 114 |
sthapattya-o-nirman is a renowned Architectural and Engineering Magazine. They have latest bazardar. For details visit ths site from the above link