Break Up Details (Don's use Rate, its PWD rate 2008)

Logistic support to monthly progress meeting between Contractor and Emplyer at the Engineer's office at site
1. Logistic support to arrange and conducting progress meeting L.S. = 1500
2. Incidental, sundries etc. L.S. = 200
Total = 1700
Profit 0.1 = 170
Overhead 0.035 = 59.5
1929.5
Add VAT with adjustment factor 1.04712 0.045 = 90.92
Grand total = 2020.42
Say, 2020 .00 each month