Break Up Details (Don's use Rate, its PWD rate 2008)

Extra rate over the rate of form work / shuttering for RCC works in floor / roof slab, cantilever slab,
waffle slab and drop panels where the free height of the structure exceeds 4 meter (rate is considered for each addl. meter height)
Considering 1 sqm.
(a) Extra for scaffolding [5% of shuttering / formwork
for ribbed or waffel slab) L.S. = 17.67
Total = 17.67
Profit 0.1 = 1.77
Overhead 0.035 = 0.62
= 20.06
Add VAT with adjustment factor 1.04712 0.045 = 0.95
Grand total = 21.01
Say, 21 .00 Per sqm.