Break Up Details (Don's use Rate, its PWD rate 2008)

Mobilization and demobilization of drop hammer type pre-cast pile driving rig.
Considering 1 set
1. Truck fare in/c loading and unloading 2 trips @ 800 Per trip = 1600
2. Incidental and sundries etc. L.S = 150
Total = 1750
Profit 0.1 = 175
Overhead 0.035 = 61.25
= 1986.25
Add VAT with adjustment factor 1.04712 0.045 = 93.59
Grand total = 2079.84
Say, 2080 .00 Per set.