Break Up Details (Don's use Rate, its PWD rate 2008)

Making groove in plaster on outside wall upto size 50mm X 6mm
Consideration 20'-0" work
Size of groove 2" X 1/4"
a) Labour Cost:
a) Mason 0.125 No. @ 250 each = 31.25
b) Ordinary Labour 0.125 No. @ 150 each = 18.75
b) Scaffolding, Tools, Sundries etc. LS. = 10
Total = 60
Profit 0.1 = 6
Overhead 0.035 = 2.1
= 68.1
Add VAT with adjustment factor 1.04712 0.045 = 3.21
Grand total = 71.31
Rate per rft. = 3.57
Rate per rm. = 11.71
Say, 12 .00 Per rm.