Break Up Details (Don's use Rate, its PWD rate 2008)

Cement paint 3 coats (one coat is for priming)
Considering 100 sft. of work
1. Skilled labour for cleaning,
washing and wetting etc. 0.1 No. @ 200 each = 12
2. Painter for applying paint 0.5 No. @ 300 each = 80
3. Helper to painter 0.5 No. @ 200 each = 60
4. Labour for 7 days curing: 1 No. @ 150 each = 100
5. Scaffolding, local carriage, sundries etc. L.S. = 37.5
6. Cement paint 3.25 kg. @ 64 Per kg. = 208
Total = 497.5
Profit 0.1 = 49.75
Overhead 0.035 = 17.41
= 564.66
Add VAT with adjustment factor 1.04712 0.045 = 26.61
Grand total = 591.27
Rate per sft. = 5.91
Rate per sqm. = 63.62
Say, 64 .00 Per sqm.