Break Up Details (Don's use Rate, its PWD rate 2008)

1" compacted bitumenous carpeting (with shingles)
Considering 100 sft. of work
1. Cost of bituminous work except cost of
stone chips & its breaking cost Same as item No. 190(c) = 2290.18
2. Cost of shingles 10.5 cft. @ 4400 Per % cft. = 462
Total = 2752.18
Profit 0.1 = 275.22
Overhead 0.035 = 96.33
= 3123.73
Add VAT with adjustment factor 1.04712 0.045 = 147.19