Break Up Details (Don's use Rate, its PWD rate 2008)

Levelling and dressing the lawn areas to proper slope and grade.
Considering 1000 sft. of work
(a) Labour for spading up to 6" depth in/c
cutting earth, levelling-dressing etc. 1.25 Nos. @ 150 each = 187.5
(b) Tools & Plant, sundries, incidental etc. L.S. = 37.5
Total = 225
Profit 0.1 = 22.5
Overhead 0.035 = 7.88
= 255.38
Add VAT with adjustment factor 1.04712 0.045 = 12.03
Grand total = 267.41
Rate per sft. = 0.27
Rate per sqm. = 2.91
Say, 2.9 0 Per sqm.