Item 07.1.10.2
(From Secondary Input : Item C-11) Profit 0.1 = 21.56
Overhead 0.035 = 7.55
= 244.71
Add VAT with adjustment factor 1.04712 0.045 = 11.53
Grand total = 256.24
Say, 256 .00 Per sqm..
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago