Item 07.4.4.2
(From Secondary Input : Item C-15) Profit 0.1 = 23.15
Overhead 0.035 = 8.1
= 262.78
Add VAT with adjustment factor 1.04712 0.045 = 12.38
Grand total = 275.16
Say, 275 .00 Per sqm.
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago