Item 23.1.4
Considering 1000 cft. of excavation work
(i) Extra labour 1 No. @ 150 each = 150
Profit 0.1 = 15
Overhead 0.035 = 5.25
= 170.25
Add VAT with adjustment factor 1.04712 0.045 = 8.02
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago