Item 24.1.2
Considering 1000 cft. of erth work
(i) E/W upto 5'-0" lift Same as item No.183(a) = 1610
(ii) Extra labour for additional lift 1.5 Nos. @ 150 each = 225
Total = 1835
Profit 0.1 = 183.5
Overhead 0.035 = 64.23
= 2082.73
Add VAT with adjustment factor 1.04712 0.045 = 98.14
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago