Item 24.1.4
Considering 1000 cft. of earth work
(i) E/W upto 11'-0" lift: Same as item No. 183(c) = 2060
(ii) Extra labour for additional lift 1.5 Nos. @ 150 each = 225
Total = 2285
Profit 0.1 = 228.5
Overhead 0.035 = 79.98
= 2593.48
Add VAT with adjustment factor 1.04712 0.045 = 122.21
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago