Item 26.14.1
White flat/squatting urinal (Bangladeshi), size (mm) 610 x 375 x 85 wt. 14 kg.or equivalent
Considering 1 No. of fixture
1. White flat/squatting urinal 1 No. @ 1250 each = 1250
2. Fitting fixing materials:
(a) Cement mortar (1:4)
(i) Cement 0.2 bag @ 370 Per bag = 74
(ii) Sand (F.M. 1.2) 0.1 cft. @ 1300 Per % cft. = 1.3
3. Labour:
(a) Plumber 0.2 No. @ 300 each = 60
(b) Skilled labour 0.25 No. @ 200 each = 50
(c) Ordinary labour 0.5 No. @ 150 each = 75
Total = 1510.3
Profit 0.1 = 151.03
Overhead 0.035 = 52.86
= 1714.19
Add VAT with adjustment factor 1.04712 0.045 = 80.77
Grand total = 1794.96
Rate per No. = 1794.96
Say, 1795 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago