Item 26.29
150 x 150 mm size plastic-grating with hinged cover
Considering 1 No. of fixture
1. Plastic-grating 1 No. @ 150 each = 150
2. Fitting fixing materials:
(a) Solvent cement 13.5 grm. @ 1 Per grm. = 13.5
(b) Cement mortar (1:4):
(i) Cement 0.02 bag. @ 370 Per bag = 7.4
(ii) Sand (F.M. 1.2) 0.1 cft. @ 1300 Per % cft. = 1.3
3. Labour:
(a) Plumber 0.05 No. @ 300 each = 15
(b) Skilled labour 0.15 No. @ 200 each = 30
Total = 217.2
Profit 0.1 = 21.72
Overhead 0.035 = 7.6
= 246.52
Add VAT with adjustment factor 1.04712 0.045 = 11.62
Grand total = 258.14
Rate per No. = 258.14
Say, 258 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago