Item 26.47.6
Considering 1 No. of fixture
(a) 50 mm dia G.I. Union 1 No. @ 170 each = 170
(b) Fitting fixing materials:
(i) Teflon tape 2.05 rft. @ 1 Per rft. = 2.05
(c) Labour:
(i) Plumber 0.07 No. @ 300 each = 21
(ii) Skilled labour 0.12 No. @ 200 each = 24
(iii) Ordinary labour 0.15 No. @ 150 each = 22.5
Total = 239.55
Profit 0.1 = 23.96
Overhead 0.035 = 8.38
= 271.89
Add VAT with adjustment factor 1.04712 0.045 = 12.81
Grand total = 284.7
Rate per No. = 284.7
Say, 285 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago