Item 26.48.2
Considering 1 No. of fixture
(a) 20 mm dia Gate Valve 1 No. @ 230 each = 230
(b) Fitting fixing materials:
(i) Teflon tape 0.8 rft. @ 1 Per rft. = 0.8
(c) Labour:
(i) Plumber 0.03 No. @ 300 each = 9
(ii) Skilled labour 0.08 No. @ 200 each = 16
(iii) Ordinary labour 0.06 No. @ 150 each = 9
Total = 264.8
Profit 0.1 = 26.48
Overhead 0.035 = 9.27
= 300.55
Add VAT with adjustment factor 1.04712 0.045 = 14.16
Grand total = 314.71
Rate per No. = 314.71
Say, 315 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago