Item 26.48.3
Considering 1 No. of fixture
(a) 25 mm dia Gate Valve 1 No. @ 350 each = 350
(b) Fitting fixing materials:
(i) Teflon tape 1.05 rft. @ 1 Per rft. = 1.05
(c) Labour:
(i) Plumber 0.04 No. @ 300 each = 12
(ii) Skilled labour 0.09 No. @ 200 each = 18
(iii) Ordinary labour 0.07 No. @ 150 each = 10.5
Total = 391.55
Profit 0.1 = 39.16
Overhead 0.035 = 13.7
= 444.41
Add VAT with adjustment factor 1.04712 0.045 = 20.94
Grand total = 465.35
Rate per No. = 465.35
Say, 465 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago