Item 26.48.4
Considering 1 No. of fixture
(a) 32 mm dia Gate Valve 1 No. @ 410 each = 410
(b) Fitting fixing materials:
(i) Teflon tape 1.32 rft. @ 1 Per rft. = 1.32
(c) Labour:
(i) Plumber 0.05 No. @ 300 each = 15
(ii) Skilled labour 0.1 No. @ 200 each = 20
(iii) Ordinary labour 0.1 No. @ 150 each = 15
Total = 461.32
Profit 0.1 = 46.13
Overhead 0.035 = 16.15
= 523.6
Add VAT with adjustment factor 1.04712 0.045 = 24.67
Grand total = 548.27
Rate per No. = 548.27
Say, 548 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago