Item 26.50.8
Considering 1 No. of fixture
(a) 75 mm dia Check Valve 1 No. @ 2150 each = 2150
(b) Fitting fixing materials:
(i) Teflon tape 3.13 rft. @ 1 Per rft. = 3.13
(c) Labour:
(i) Plumber 0.1 No. @ 300 each = 30
(ii) Skilled labour 0.175 No. @ 200 each = 35
(iii) Ordinary labour 0.2 No. @ 150 each = 30
Total = 2248.13
Profit 0.1 = 224.81
Overhead 0.035 = 78.68
= 2551.62
Add VAT with adjustment factor 1.04712 0.045 = 120.23
Grand total = 2671.85
Rate per No. = 2671.85
Say, 2672 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago