Item 26.50.9
Considering 1 No. of fixture
(a) 100 mm dia Check Valve 1 No. @ 2500 each = 2500
(b) Fitting fixing materials:
(i) Teflon tape 4.19 rft. @ 1 Per rft. = 4.19
(c) Labour:
(i) Plumber 0.115 No. @ 300 each = 34.5
(ii) Skilled labour 0.19 No. @ 200 each = 38
(iii) Ordinary labour 0.225 No. @ 150 each = 33.75
Total = 2610.44
Profit 0.1 = 261.04
Overhead 0.035 = 91.37
= 2962.85
Add VAT with adjustment factor 1.04712 0.045 = 139.61
Grand total = 3102.46
Rate per No. = 3102.46
Say, 3102 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago