Item 26.51.5
Considering 1 No. of fixture
(a) 40 mm dia Float Valve 1 No. @ 650 each = 650
(b) Fitting fixing materials:
(i) Teflon tape 0.27 rft. @ 1 Per rft. = 0.27
(c) Labour:
(i) Plumber 0.06 No. @ 300 each = 18
(ii) Skilled labour 0.11 No. @ 200 each = 22
(iii) Ordinary labour 0.2 No. @ 150 each = 30
Total = 720.27
Profit 0.1 = 72.03
Overhead 0.035 = 25.21
= 817.51
Add VAT with adjustment factor 1.04712 0.045 = 38.52
Grand total = 856.03
Rate per No. = 856.03
Say, 856 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago