Item 26.76.3
Considering 1 No. pit cover
1. R.C.C. (1:2:4) for slab:
1 x 3'-8" x 3'-8" x 0'-3"= 3.37 cft. @ 13390.5 Per % cft. = 451.26
2. 1% re-inforcement in/c fabrication 16.51 Ibs. @ 31.82 Per Ibs. = 525.35
3. 12 mm plaster with n.c.f.:
4 x 3'-8" x 0'-3" + 3'-8" x 3'-8"= 17.14 sft. @ 1358 Per % sft. = 232.76
4. Extra labour for placing pit cover
Ordinary labour 0.1 No. @ 150 each = 15
Total = 1224.37
Profit 0.1 = 122.44
Overhead 0.035 = 42.85
= 1389.66
Add VAT with adjustment factor 1.04712 0.045 = 65.48
Grand total = 1455.14
Rate per No. = 1455.14
Say, 1455 .00 each