Item 26.8
Supplying, fitting-fixing foot-rest (Bangladeshi): white or coloured,
size (mm) 260 x 227 x 25. wt.: 1 kg. or equivalent
Considering 1 No. of fixture
1. White or coloured foot-rest: 1 No. @ 188 each = 188
2. Fitting fixing materials:
(a) Cement mortar (1:4)
(i) Cement 0.05 bag. @ 370 Per bag = 18.5
(ii) Sand (F.M. 1.2) 0.25 cft. @ 1300 Per % cft. = 3.25
3. Labour:
(a) Skilled labour 0.25 No. @ 200 each = 50
Total = 259.75
Profit 0.1 = 25.98
Overhead 0.035 = 9.09
= 294.82
Add VAT with adjustment factor 1.04712 0.045 = 13.89
Grand total = 308.71
Rate per No. = 308.71
Say, 309 .00 each