Item 26.80.3
Considering 1 No. soak-well
1. Earth-work: 608.9 cft. @ 1412.5 Per % 0 cft. = 860.07
2. R.C.C. (1:2:4) in curb well with 1.25% reinforcement
(excluding cost of reinforcement) 12.24 cft. @ 13390.5 Per % cft. = 1639
3. 10" Honeycomb brick-work (1:6) in cement
mortar (87.57% of solid b/work). 94.4 cft. @ 7587.28 Per % cft. = 7162.39
4. 10" solid brick-work (1:6) 97.56 cft. @ 8664.25 Per % cft. = 8452.84
5. R.C.C. (1:2:4) in curb well with 1.25% reinforcement
(excluding cost of reinforcement) 8.32 cft. @ 13390.5 Per % cft. = 1114.09
6. 40 grade reinforcement &
fabrication 1.25% 125.93 Ibs. @ 31.82 Per Ibs. = 4007.09
7. 18" dia water sealed heavy type C.I. man-hole cover with locking
arrangement in/c making holes. 1 No. @ 563 each = 563
8. Supply and filling graded
khoa and sand. 188.4 cft. @ 54.03 Per cft. = 10179.25
Total = 33977.73
Profit 0.1 = 3397.77
Overhead 0.035 = 1189.22
= 38564.72
Add VAT with adjustment factor 1.04712 0.045 = 1817.19
Grand total = 40381.91
Rate per No. = 40381.91
Say, 40382 .00 each