Item 27.1
Mobilization: Transportation of materials, equipments, tools and plants and boring rig to work site.
Considering mobilization for 1 set
Transportation of materials, equipments, tools and
plants, boring rigs to work site for sinking
38 mm test and observation well. L.S. = 4000
Profit 0.1 = 400
Overhead 0.035 = 140
= 4540
Add VAT with adjustment factor 1.04712 0.045 = 213.93
Total = 4753.93
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago