Item 27.2.2
Boring by using 100 mm dia cutter
Considering 50 m to 100 m
(a) Rate for 0 m to 50 m = 118.85
(b) Add for 50 m to 100 m 0.15 = 17.83
Total = 136.68
Rate Per meter (50 m to 100 m) = 136.68
Say, 137 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago