Item 27.2.3
Boring by using 100 mm dia cutter
Considering 100 m to 152 m
(a) Rate for 50 m to 100 m = 136.68
(b) Add for 100 m to 152 m 0.15 = 20.5
Total = 157.18
Rate Per meter (100 m to 152 m) = 157.18
Say, 157 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago