Item 27.2.4
Boring by using 100 mm dia cutter
Considering 152 m to 200 m
(a) Rate for 100 m to 152 m = 157.18
(b) Add for 152 m to 200 m 0.15 = 23.58
Total = 180.76
Rate Per meter (152 m to 200 m) = 180.76
Say, 181 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago