Item 27.2.5
Boring by using 100 mm dia cutter
Considering 200 to 250 m
(a) Rate for 152 m to 200 m = 180.76
(b) Add for 200 m to 250 m 0.15 = 27.11
Total = 207.87
Rate Per meter (200 m to 250 m) = 207.87
Say, 208 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago