Item 27.2.6
Boring by using 100 mm dia cutter
Beyond 250 m
(a) Rate for 200 m to 250 m = 207.87
(b) Add for Beyond 250 m 0.15 = 31.18
Total = 239.05
Rate Per meter (beyond 250 m) = 239.05
Say, 239 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago