Item 27.22
Long term pumping test of the well by required capacity pump including drawdown and recovery
test etc. complete
Considering 72 hrs.
(a) Hire charge of pump in/c
spare and maintenance 72 hrs @ 156.25 Per hour = 11250
(b) Fuel for pump:
@ 3.33 liter per hour 240 liter @ 65 Per liter = 15600
(c) Foreman: @ 1 No. per 8 hrs 9 Nos. @ 350 each = 3150
(d) Skilled labour 6 Nos. @ 200 each = 1200
(e) Local carriage, T & P L.S. = 375
Total = 31575
Profit 0.1 = 3157.5
Overhead 0.035 = 1105.13
= 35837.63
Add VAT with adjustment factor 1.04712 0.045 = 1688.68
Grand total = 37526.31
Rate per hour = 521.2
Say, 521 .00 Per Hr.
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago