Item 27.49.4
600 mm dia boring
Considering 152 m to 200 m
(a) Rate for 100 m to 152 m = 1571.76
(b) Add for 152 m to 200 m 0.15 = 235.76
Total = 1807.52
Rate Per meter (152 m to 200 m) = 1807.52
Say, 1808 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago