Item 27.5.3
(1) Cost for furnishing design of tube-well considering 3 bore = 14000
(2) Testing of water collected from 3 test bore = 12600
(3) Sieve analysis for sand
from different layers 9 tests @ 900 Per test = 8100
(3) Maintaining the bore holes and tools and plants etc. at site untill
satisfactory results are obtained from laboratory, filling and sealing
the bore holes 3 No. @ 2000 Per test bore = 6000
40700
Profit 0.1 = 4070
Overhead 0.035 = 1424.5
= 46194.5
Add VAT with adjustment factor 1.04712 0.045 = 2176.7
Grand total = 48371.2
Say, 48371 .00 each
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago