Item 27.56.4
325 mm dia boring
Considering 152 m to 200 m
(a) Rate for 100 m to 152 m = 707.3
(b) Add for 152 m to 200 m 0.15 = 106.1
Total = 813.4
Rate Per meter (152 m to 200 m) = 813.4
Say, 813 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago