Item 27.67
Long term pumping test of the well by required capacity pump including drawdown and
recovery test etc. complete
Considering 72 hrs.
(a) Hire charge of pump in/c
spare and maintenance 72 hrs @ 195.31 Per hour = 14062.32
(b) Fuel for pump:
@ 4.375 liter per hour 240 liter @ 65 Per liter = 15600
(c) Foreman: @ 1 No. per 8 hrs 9 Nos. @ 350 each = 3150
(d) Skilled labour 6 Nos. @ 200 each = 1200
(e) Local carriage, T & P L.S. = 525
Total = 34537.32
Profit 0.1 = 3453.73
Overhead 0.035 = 1208.81
= 39199.86
Add VAT with adjustment factor 1.04712 0.045 = 1847.11
Grand total = 41046.97
Rate per hour = 570.1
Say, 570 .00 Per Hr.