Item 27.70.1
400 mm dia boring
a) Considering 0 m to 50 m
Cost for boring including all equipment,
accessories, labours and materials along
with insurance coverage of risks 50 meter @ 600 Per meter = 30000
Profit 0.1 = 3000
Overhead 0.035 = 1050
= 34050
Add VAT with adjustment factor 1.04712 0.045 = 1604.45
Total = 35654.45
Rate Per meter (from 0 m to 50 m) = 713.09
Say, 713 .00 Per m
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago