Item 27.71.7
Supplying centralizer made with 12 mm dia M.S. rod of approved design
Considering 1 No.
(a) 1 set centralizer consists of four leaves:
10 mm dia M.S. rod
4 x 3'-0"=12'-0" 4.512 Ibs @ 30.39 Per meter = 137.12
(b) Carriage, welding, fabrication and other necessary cost L.S. = 30
Total = 167.12
Profit 0.1 = 16.71
Overhead 0.035 = 5.85
= 189.68
Add VAT with adjustment factor 1.04712 0.045 = 8.94
Grand total = 198.62
Rate each. = 198.62
Say, 199 .00 each.
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago