Item 28.10.2
Considering 100 sft.
(i) Cutting & permanent re-installment of road L.S. = 3847.5
Incidental charges 0.1 = 384.75
Profit 0.1 = 384.75
Overhead 0.035 = 13.47
= 4630.47
Add VAT with adjustment factor 1.04712 0.045 = 218.19
Grand total = 4848.66
Rate per sft. = 48.49
Rate per sqm. = 521.95
Say, 522 .00 Per sqm.
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago