Item 28.11.2
Installation of commercial and domestic house line
1/2" dia G.I. pipe line
Considering 1 rft. of work
(a) G.I. pipe 1 rft. @ 38 Per rft. = 38
(b) Fittings L.S. = 9.7
(c) Labour L.S. = 4.88
Total = 52.58
Incidental charges 0.1 = 5.26
Profit 0.1 = 5.26
Overhead 0.035 = 0.18
= 63.28
Add VAT with adjustment factor 1.04712 0.045 = 2.98
Grand total = 66.26
Rate per rft. = 66.26
Rate per rm. = 217.4
Say, 217 .00 Per rm.
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago