Item 29.8
Anti-termite treatment of electric and telephone system by inserting a plugging material
(cotton. foam etc.) with anti-termite chemical DURSBAN 20EC etc.
Considering 8 switch-board in/c wires & cable
(a) DURASBAN 20EC 0.8 liter @ 567 Per liter = 453.6
(b) Skilled labour 1 No. @ 200 each = 200
(c) Skilled technician 1 No. @ 400 each = 400
(d) Cost of plugging materials L.S. = 22.5
Total = 1076.1
Profit 0.1 = 107.61
Overhead 0.035 = 37.66
= 1221.37
Add VAT with adjustment factor 1.04712 0.045 = 57.55
Grand total = 1278.92
Rate per switch-board = 159.87
Say, 160 .00 Per board
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago