Item 31.2
Field vist and inspection of sampling and samples by the Geo-tech. Expert / Engineer
Considering 1 No. site
(a) Field visit and inspection of sampling and
samples by the Geo-tech. Expert / Engineer L.S. = 3214.29
Profit 0.1 = 321.43
Overhead 0.035 = 112.5
= 3648.22
Add VAT with adjustment factor 1.04712 0.045 = 171.91
Total = 3820.13
Rate per site = 3820.13
Say, 3820 .00 Per site
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago