Item 31.6
Collection of undisturbed soil samples in 75 mm tube from cohesive layer in/c preservation,
and transportation: (ASTM D-1587-83)
Considering 1 No. sample
(i) Collection, preservation, transportation and incidental charges L.S. = 91
Profit 0.1 = 9.1
Overhead 0.035 = 3.19
= 103.29
Add VAT with adjustment factor 1.04712 0.045 = 4.87
Total = 108.16
Rate per sample = 108.16
Say, 108 .00 Per sample
Card image cap
Card title

This is a wider card with supporting text below as a natural lead-in to additional content. This content is a little bit longer.

Last updated 3 mins ago