(b) For cutting mosaic mosaic wall surface with mumic stone: |
|
|
|
|
|
|
|
| 390.00 | per day | = | Tk. | 3,900.00 |
(c) For spreading oxalic acid and washing: |
| 175.00 | each | = | Tk. | 437.50 |
1. Ordinary labour 1 no @ Tk. |
| 320.00 | per day | = | Tk. | 320.00 |
|
|
| Sub-total (b) | = | Tk. | 5,870.00 |
|
| Sub-total (a+b) | = | Tk. | 13,265.00 | |
| Profit | 10.00% | = | Tk. | 1,326.50 | |
| Overhead | 3.50% | = | Tk. | 464.28 | |
|
|
| Total | = | Tk. | 15,055.78 |
Add VAT with adjustment factor | 1.06383 | 6.00% | = | Tk. | 961.01 | |
|
|
| Grand Total | = | Tk. | 16,016.79 |
(i) Ground floor |
|
| Rate per sft | = | Tk. | 160.17 |
|
|
| Rate per sqm | = | Tk. | 1,724.07 |
Say, Tk. |
| 1,724 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
Item No.- 05.5.2 |
|
|
|
|
|
|
10 mm thick (finished) mosaic on wall with Pakistani chip susing 100% white cement. |
|
|
|
|
|
|
Considering 100 sft of work |
|
|
|
|
|
|
A. Materials
|
| 26.00 | per kg | = | Tk. | 3,250.00 |
|
| 20.00 | per kg | = | Tk. | 2,500.00 |
|
| 420.00 | each | = | Tk. | 140.00 |
|
| 17.55 | per sft | = | Tk. | 1,755.00 |
B. Labour: |
|
|
|
|
|
|
Same as item No.- 05.5.1 100 sft @ Tk. |
| 5,870.00 | per % sft | = | Tk. | 5,870.00 |
|
|
| Sub - Total | = | Tk. | 13,515.00 |
| Profit | 10.00% | = | Tk. | 1,351.50 | |
| Overhead | 3.50% | = | Tk. | 473.03 | |
|
|
| Total |
| Tk. | 15,339.53 |
Add VAT with adjustment factor | 1.06383 | 6.00% | = | Tk. | 979.12 | |
|
|
| Grand Total | = | Tk. | 16,318.65 |
(i) Ground floor |
|
| Rate per sft | = | Tk. | 163.19 |
|
|
| Rate per sqm | = | Tk. | 1,756.58 |
Say, Tk. |
| 1,757 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
Item No.- 05.6.1 |
|
|
|
|
|
|
10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1 | : 1) |
|
|
|
|
|
Considering 100 sft of work |
|
|
|
|
|
|
A. Materials: |
|
|
|
|
|
|
|
| 26.00 | per kg | = | Tk. | 1,625.00 |
|
| 395.00 | per bag | = | Tk. | 493.75 |
|
| 18.00 | per kg | = | Tk. | 2,250.00 |
|
| 420.00 | each | = | Tk. | 140.00 |
|
| 17.55 | per sft | = | Tk. | 1,755.00 |
|
|
| Sub-total (a) | = | Tk. | 6,263.75 |
B. Labour: |
|
|
|
|
|
|
(a) For mixing, laying, compacting & curing: |
|
|
|
|
|
|
|
| 600.00 | per day | = | Tk. | 600.00 |
|
| 390.00 | per day | = | Tk. | 292.50 |
(b) Labour for cutting mosaic wall surface with mumic stone: |
| 320.00 | per day | = | Tk. | 320.00 |
|
| 390.00 | per day | = | Tk. | 3,900.00 |
(c) For spreading oxalic acid and washing: |
| 175.00 | each | = | Tk. | 437.50 |
1. Ordinary labour 1 no @ Tk. |
| 320.00 | per day | = | Tk. | 320.00 |
|
|
| Sub-total (b) | = | Tk. | 5,870.00 |
|
| Sub-total (a+b) | = | Tk. | 12,133.75 | |