(b) For cutting mosaic mosaic wall surface with mumic stone:

 

 

 

 

 

 

  1. Skilled labour 10 nos @ Tk.

 

390.00

per day

=

Tk.

3,900.00

  1. Pumic stone 2.5 nos @ Tk.

(c) For spreading oxalic acid and washing:

 

175.00

each

=

Tk.

437.50

1. Ordinary labour 1 no @ Tk.

 

320.00

per day

=

Tk.

320.00

 

 

 

Sub-total (b)

=

Tk.

5,870.00

 

 

Sub-total (a+b)

=

Tk.

13,265.00

 

Profit

10.00%

=

Tk.

1,326.50

 

Overhead

3.50%

=

Tk.

464.28

 

 

 

Total

=

Tk.

15,055.78

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

961.01

 

 

 

Grand Total

=

Tk.

16,016.79

(i) Ground floor

 

 

Rate per sft

=

Tk.

160.17

 

 

 

Rate per sqm

=

Tk.

1,724.07

Say, Tk.

 

1,724 .00 per sqm

 

 

 

 

 

 

 

 

 

 

Item No.- 05.5.2

 

 

 

 

 

 

10 mm thick (finished) mosaic on wall with Pakistani chip susing 100% white cement.

 

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

 

A. Materials

  1. White cement 125 kg @ Tk.

 

26.00

per kg

=

Tk.

3,250.00

  1. Pakistan Onix mosaic chips 125 kg @ Tk.

 

20.00

per kg

=

Tk.

2,500.00

  1. Minar stone 1/3 no @ Tk.

 

420.00

each

=

Tk.

140.00

  1. 1/2" thick plaster (1:4) 100 sft @ Tk.

 

17.55

per sft

=

Tk.

1,755.00

B. Labour:

 

 

 

 

 

 

Same as item No.- 05.5.1 100 sft @ Tk.

 

5,870.00

per % sft

=

Tk.

5,870.00

 

 

 

Sub - Total

=

Tk.

13,515.00

 

Profit

10.00%

=

Tk.

1,351.50

 

Overhead

3.50%

=

Tk.

473.03

 

 

 

Total

 

Tk.

15,339.53

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

979.12

 

 

 

Grand Total

=

Tk.

16,318.65

(i) Ground floor

 

 

Rate per sft

=

Tk.

163.19

 

 

 

Rate per sqm

=

Tk.

1,756.58

Say, Tk.

 

1,757 .00 per sqm

 

 

 

 

 

 

 

 

 

 

Item No.- 05.6.1

 

 

 

 

 

 

10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1

: 1)

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

 

A. Materials:

 

 

 

 

 

 

  1. White cement 62.5 kg @ Tk.

 

26.00

per kg

=

Tk.

1,625.00

  1. Grey cement 1.25 bag @ Tk.

 

395.00

per bag

=

Tk.

493.75

  1. Indian Deradun mosaic chips 125 kg @ Tk.

 

18.00

per kg

=

Tk.

2,250.00

  1. Minar stone 1/3 no @ Tk.

 

420.00

each

=

Tk.

140.00

  1. 1/2" thick plaster (1:4) 100 sft @ Tk.

 

17.55

per sft

=

Tk.

1,755.00

 

 

 

Sub-total (a)

=

Tk.

6,263.75

B. Labour:

 

 

 

 

 

 

(a) For mixing, laying, compacting & curing:

 

 

 

 

 

 

  1. Head mason 1 no @ Tk.

 

600.00

per day

=

Tk.

600.00

  1. Skilled labour 3/4 no @ Tk.

 

390.00

per day

=

Tk.

292.50

  1. Ordinary labour 1 no @ Tk.

(b) Labour for cutting mosaic wall surface with mumic stone:

 

320.00

per day

=

Tk.

320.00

  1. Skilled labour 10 nos @ Tk.

 

390.00

per day

=

Tk.

3,900.00

  1. Pumic stone 2.5 nos @ Tk.

(c) For spreading oxalic acid and washing:

 

175.00

each

=

Tk.

437.50

1. Ordinary labour 1 no @ Tk.

 

320.00

per day

=

Tk.

320.00

 

 

 

Sub-total (b)

=

Tk.

5,870.00

 

 

Sub-total (a+b)

=

Tk.

12,133.75