Prev Next


 

 

Item No.- 25.1

 

 

 

 

 

Labour charge for scraping lawn surface upto 1.5" thick Considering 1000 sft of work

 

 

 

 

 

  1. Ordinary labour for scraping 1.75 nos @
  2. Ordinary labour for picking-up all sorts of

bricks, bats, rubbish etc. 1/3 no @

Tk. Tk.

320.00 each

320.00 each

=

=

Tk. Tk.

560.00

106.67

  1. Tools & plant, incidental, sundries etc.

 

LS

=

Tk.

51.20

 

 

Sub - Total

=

Tk.

717.87

 

 

Profit 10.00%

=

Tk.

71.79

 

 

Overhead 3.50%

=

Tk.

25.13

 

 

Total

=

Tk.

814.79

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

52.01

 

 

Grand Total

=

Tk.

866.80

 

 

Rate per sft

=

Tk.

0.87

 

 

Rate per sqm

=

Tk.

9.36

Say,

Tk.

9 .00 per sqm

 

 

 

 

 

 

 

 

 

Item No.- 25.2

 

 

 

 

 

Preparation of ground to make the scraped lawn fit for plantation

 

 

 

 

 

Considering 1000 sft of work

  1. Labour charge for spading

up to 6" depth 4.5 nos @

Tk.

320.00 each

=

Tk.

1,440.00

  1. Tools & plant, incidental, sundries etc.

 

LS

=

Tk.

80.00

 

 

Sub - Total

=

Tk.

1,520.00

 

 

Profit 10.00%

=

Tk.

152.00

 

 

Overhead 3.50%

=

Tk.

53.20

 

 

Total

=

Tk.

1,725.20

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

110.12

 

 

Grand Total

=

Tk.

1,835.32

 

 

Rate per sft

=

Tk.

1.84

 

 

Rate per sqm

=

Tk.

19.81

Say,

Tk.

20 .00 per sqm

 

 

 

 

 

 

 

 

 

Item No.- 25.3

 

 

 

 

 

Levelling and dressing the lawn areas to proper slope and grade.

 

 

 

 

 

Considering 1000 sft of work

  1. Labour for spading up to 6" depth in/c

cutting earth, levelling-dressing etc. 1.25 nos @

Tk.

320.00 each

=

Tk.

400.00

  1. Tools & Plant, sundries, incidental etc.

 

LS

=

Tk.

80.00

 

 

Sub - Total

=

Tk.

480.00

 

 

Profit 10.00%

=

Tk.

48.00

 

 

Overhead 3.50%

=

Tk.

16.80

 

 

Total

=

Tk.

544.80

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

34.77

 

 

Grand Total

=

Tk.

579.57

 

 

Rate per sft

=

Tk.

0.58

 

 

Rate per sqm

=

Tk.

6.24

Say,

Tk.

6 .00 per sqm

 

 

 

 

 

 

 

 

 

Item No.- 25.4

 

 

 

 

 

Supplying approved best quality ALLUVIAL LOAMY SILTY soil

 

 

 

 

 

Considering 180 cft of soil

  1. Cost of silty soil in/c carrying by truck or any other means

in/c loading and unloading. 180 cft @

Tk.

1,800.00 Per % cft

=

Tk.

3,240.00

  1. Local carriage, storage and sundries

 

LS

=

Tk.

320.00

 

 

Sub - Total

=

Tk.

3,560.00

 

 

Profit 10.00%

=

Tk.

356.00