Approval of P & C | |
Approval of Structural Designer | |
Revision #/ Date | |
Casting Location | |
Design Strength | |
Mix Design | |
Mix Proportion | |
Admixture (Quick setting, water proofing, strength) | |
Machinery & Equipment Mixture Machine | |
Machinery & Equipment Vibrator Machine | |
Machinery & Equipment Vibrator Nozzle | |
Machinery & Equipment Water Pump | |
Machinery & Equipment Roof/ Tower Hoist | |
Machinery & Equipment Power & Water Supply | |
Materials Availability of Stone chips/Shingles | |
Materials Availability of Coarse Sand | |
Materials Availability Fine Sand | |
Materials Availability of Cement | |
Materials Availability of Potable water | |
Materials Screening & Watering of Aggregates | |
Testing Equipment Cube Mould | |
Testing Equipment Slump Cone | |
Operation Load Counting | |
Operation Time of Mixing | |
Operation Consumption time of per Batch | |
Curing Casting Date | |
Curing No. of days of curing |