before, during and after RCC works
Approval of P & C
Approval of Structural Designer
Revision #/ Date
Casting Location
Design Strength
Mix Design
Mix Proportion
Admixture (Quick setting, water proofing, strength)
Machinery & Equipment Mixture Machine
Machinery & Equipment Vibrator Machine
Machinery & Equipment Vibrator Nozzle
Machinery & Equipment Water Pump
Machinery & Equipment Roof/ Tower Hoist
Machinery & Equipment Power & Water Supply
Materials Availability of Stone chips/Shingles
Materials Availability of Coarse Sand
Materials Availability Fine Sand
Materials Availability of Cement
Materials Availability of Potable water
Materials Screening & Watering of Aggregates
Testing Equipment Cube Mould
Testing Equipment Slump Cone
Operation Load Counting
Operation Time of Mixing
Operation Consumption time of per Batch
Curing Casting Date
Curing No. of days of curing