before, during and after plastering works
Checking of surface finish at drawings Approval of P & C (Conforming about plaster)
Checking of surface finish at drawings Revision #/ Date
Internal Conduiting & Finish Check Electrical Conduiting & Switch, Socket location
Internal Conduiting & Finish Check Plumbing Conduiting
Internal Conduiting & Finish Check Cabinet & Closet Position
Internal Conduiting & Finish Check Feature & Textured Wall
Reference Level (RL) of Plaster Area Ceiling
Reference Level (RL) of Plaster Area Floor
Reference Level (RL) of Plaster Area Wall
Reference Level (RL) of Plaster Area NCF
Level & Layer Layer
Level & Layer Thickness
Level & Layer Level (Vertical & Horizontal/Shawl))
Level & Layer Sufficient Light
Level & Layer Angle/Right Angle (Muttum)
Level & Layer Wall Edge
Level & Layer Watering of Plaster area for wet surface
Level & Layer Wire mesh at extra thick, RCC joint & conduit line
Material check Sand FM
Material check Screening & Washing
Material check Water
Material check Mortar
Material check Mix Proportion
Material check Time of Mixing
Material check Consumption time of per Batch
Curing Plaster Area Marking with date
Curing No. of days of curing