Concrete Work Calculation

Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2
Concrete (1:2:4) work using BRICK CHIPS with sand of F.M. 1.2
Concrete (1:2:4) work using BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)
Concrete (1:2:4) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
Concrete (1:1.5:3) work with BRICK CHIPS (sand of F.M. 2.2)
Concrete (1:1.5:3) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
Concrete (1:1.25:2.5) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2