07.15.3 | Formwork / shuttering, prop and necessary supports etc. (WOODEN) Padestals, column, column capitals, lift wall and walls (From Secondary Input : Item C-3) Add VAT with adjustment factor |
| Profit 1.06383 | per sqm 10.00% 3.50% | = = = | Tk. | 354.89 35.49 12.42 |
07.15.4 | |||||||
Total 6.00% | = = | Tk. Tk. | 402.80 25.71 | ||||
Grand Total | = | Tk. Tk. | 428.51 344.88 | ||||
Say, | Tk. |
| 429 .00 per sqm |
| |||
Formwork / shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Tie beam and lintels |
| Profit | 10.00% | = | Tk. | 34.49 |
| (From Secondary Input : Item C-4) |
| Overhead | 3.50% | = | Tk. | 12.07 |
|
|
|
| Total | = | Tk. | 391.44 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 24.99 |
|
|
|
| Grand Total | = | Tk. | 416.43 |
07.15.5 | Say, | Tk. |
| 417 .00 per sqm |
| Tk. | 342.19 |
Formwork / shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Tee beams, Ell beams and Rectangular |
| Profit | 10.00% | = | Tk. | 34.22 |
| beams etc upto Ground Floor (Fro Seondary Inpt : Item C-5) |
| Overhead | 3.50% | = | Tk. | 11.98 |
|
|
|
| Total | = | Tk. | 388.39 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 24.79 |
|
|
|
| Grand Total | = | Tk. | 413.18 |
07.15.6 | Say, | Tk. |
| 414 .00 per sqm |
| Tk. | 377.06 |
Formwork / shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Floor and roof slab |
| Profit | 10.00% | = | Tk. | 37.71 |
| (From Secondary Input : Item C-6) |
| Overhead | 3.50% | = | Tk. | 13.20 |
|
|
|
| Total | = | Tk. | 427.97 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 27.32 |
|
|
|
| Grand Total | = | Tk. | 455.29 |
07.15.7 | Say, | Tk. |
| 456 .00 per sqm |
| Tk. | 306.34 |
Formwork / shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Cornice, railing, drop walls, louver, fins etc. |
| Profit | 10.00% | = | Tk. | 30.63 |
| (From Secondary Input : Item C-7) |
| Overhead | 3.50% | = | Tk. | 10.72 |
|
|
|
| Total | = | Tk. | 347.69 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 22.19 |
|
|
|
| Grand Total | = | Tk. | 369.88 |
07.15.8 | Say, | Tk. |
| 370 .00 per sqm |
| Tk. | 329.92 |
Formwork / shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Sunshade, false ceiling |
| Profit | 10.00% | = | Tk. | 32.99 |
| (From Secondary Input : Item C-8) |
| Overhead | 3.50% | = | Tk. | 11.55 |
|
|
|
| Total | = | Tk. | 374.46 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 23.90 |
|
|
|
| Grand Total | = | Tk. | 398.36 |
07.15.9 | Say, | Tk. |
| 399 .00 per sqm |
| Tk. | 320.44 |
Formwork/shuttering, prop and necessary supports etc. (wooden) |
|
| per sqm | = | |||
| Stair case slab and steps |
| Profit | 10.00% | = | Tk. | 32.04 |
| (From Secondary Input : Item C-9) |
| Overhead | 3.50% | = | Tk. | 11.22 |
|
|
|
| Total | = | Tk. | 363.70 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 23.21 |
|
|
|
| Grand Total | = | Tk. | 386.91 |
| Say, | Tk. |
| 387 .00 per sqm |
|
|
|