Prev Next


07.15.3

Formwork / shuttering, prop and necessary supports etc. (WOODEN)

Padestals, column, column capitals, lift wall

and walls

(From Secondary Input : Item C-3)

Add VAT with adjustment factor

 

Profit
Overhead

1.06383

per sqm

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

354.89

35.49

12.42

07.15.4

Total

6.00%

=

=

Tk. Tk.

402.80

25.71

Grand Total

=

Tk.

Tk.

428.51

344.88

Say,

Tk.

 

429 .00 per sqm

 

Formwork / shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Tie beam and lintels

 

Profit

10.00%

=

Tk.

34.49

 

(From Secondary Input : Item C-4)

 

Overhead

3.50%

=

Tk.

12.07

 

 

 

 

Total

=

Tk.

391.44

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

24.99

 

 

 

 

Grand Total

=

Tk.

416.43

07.15.5

Say,

Tk.

 

417 .00 per sqm

 

Tk.

342.19

Formwork / shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Tee beams, Ell beams and Rectangular

 

Profit

10.00%

=

Tk.

34.22

 

beams etc upto Ground Floor

(Fro Seondary Inpt : Item C-5)

 

Overhead

3.50%

=

Tk.

11.98

 

 

 

 

Total

=

Tk.

388.39

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

24.79

 

 

 

 

Grand Total

=

Tk.

413.18

07.15.6

Say,

Tk.

 

414 .00 per sqm

 

Tk.

377.06

Formwork / shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Floor and roof slab

 

Profit

10.00%

=

Tk.

37.71

 

(From Secondary Input : Item C-6)

 

Overhead

3.50%

=

Tk.

13.20

 

 

 

 

Total

=

Tk.

427.97

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

27.32

 

 

 

 

Grand Total

=

Tk.

455.29

07.15.7

Say,

Tk.

 

456 .00 per sqm

 

Tk.

306.34

Formwork / shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Cornice, railing, drop walls, louver, fins etc.

 

Profit

10.00%

=

Tk.

30.63

 

(From Secondary Input : Item C-7)

 

Overhead

3.50%

=

Tk.

10.72

 

 

 

 

Total

=

Tk.

347.69

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

22.19

 

 

 

 

Grand Total

=

Tk.

369.88

07.15.8

Say,

Tk.

 

370 .00 per sqm

 

Tk.

329.92

Formwork / shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Sunshade, false ceiling

 

Profit

10.00%

=

Tk.

32.99

 

(From Secondary Input : Item C-8)

 

Overhead

3.50%

=

Tk.

11.55

 

 

 

 

Total

=

Tk.

374.46

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

23.90

 

 

 

 

Grand Total

=

Tk.

398.36

07.15.9

Say,

Tk.

 

399 .00 per sqm

 

Tk.

320.44

Formwork/shuttering, prop and necessary supports etc. (wooden)

 

 

per sqm

=

 

Stair case slab and steps

 

Profit

10.00%

=

Tk.

32.04

 

(From Secondary Input : Item C-9)

 

Overhead

3.50%

=

Tk.

11.22

 

 

 

 

Total

=

Tk.

363.70

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

23.21

 

 

 

 

Grand Total

=

Tk.

386.91

 

Say,

Tk.

 

387 .00 per sqm