DIVISION 11. WOOD WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND RAILINGS

 

 

 

 

 

 

 

 

 

Item No.- 11.1.1

 

 

 

 

 

 

 

Supply and making door and window frames with seasoned wood Considering 1 No. door frame

Considering for door size: 3'-4" x 7'-0"

Wood reqd.: (2 x 7'-0" + 3'-4") x 0'-2.5" x 0'-5" = 1.5 cft (finished)

= (2 x 7'-0" + 3'-6") x 0'-2.75" x 0'-5.25" = 1.75 cft (gross)

 

 

 

 

 

 

 

For Mehgoni

(a) Cost of wood 1.75 cft

@

Tk.

1,800.00

per cft

=

Tk.

3,150.00

(b) Coaltaring: 2 coats 7.5 sft

(c) Labour for making frame

  1. Carpenter 0.75 no

@

@

Tk. Tk.

7.00

600.00

per sft
per day

=

=

Tk. Tk.

52.50

450.00

  1. Carpenter helper 1.0 no

@

Tk.

390.00

per day

=

Tk.

390.00

(d) Labour for fitting, fixing in position

 

 

 

LS

=

Tk.

195.00

 

 

 

 

Sub - Total

=

Tk.

4,237.50

 

 

 

Profit

10.00%

=

Tk.

423.75

 

 

 

Overhead

3.50%

=

Tk.

148.31

 

 

 

 

Total

=

Tk.

4,809.56

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

306.99

 

 

 

 

Grand Total

=

Tk.

5,116.55

 

 

 

 

Rate per cft

=

Tk.

3,411.03

 

 

 

 

Rate per cum

=

Tk.

120,460.52

 

Say,

Tk.

120,461

.00 per cum

 

 

 

 

 

 

 

 

 

 

 

Item No.- 11.1.2

 

 

 

 

 

 

 

Supply and making door and window frames with seasoned wood

 

 

 

 

 

 

 

Considering 1 No. door frame

 

 

 

 

 

 

 

Considering for door size: 3'-4" x 7'-0"

 

 

 

 

 

 

 

Wood reqd.: (2 x 7'-0" + 3'-4") x 0'-2.5" x 0'-5" =1.5 cft (finished)

 

 

 

 

 

 

 

= (2 x 7'-0" + 3'-6") x 0'-2.75" x 0'-5.25" = 1.75 (gross)

 

 

 

 

 

 

 

Garjan/Jam / local sal wood

(a) Cost of wood 1.75 cft

(b) Coaltaring: 2 coats

1 x (2 x 7'-2.5" + 3'-4") x 0'-5"= 7.5 sft

@

@

Tk. Tk.

2,000.0

7.00

per cft
per sft

=

=

Tk. Tk.

3,500.00

52.50

(c) Labour for making frame

 

 

 

 

=

 

 

  1. Carpenter 0.75 no

@

Tk.

600.00

per day

=

Tk.

450.00

  1. Carpenter helper 1.0 no

@

Tk.

390.00

per day

=

Tk.

390.00

(d) Labour for fitting, fixing in position

 

 

 

LS

=

Tk.

195.00

 

 

 

 

Sub - Total

=

Tk.

4,587.50

 

 

 

Profit

10.00%

=

Tk.

458.75

 

 

 

Overhead

3.50%

=

Tk.

160.56

 

 

 

 

Total

=

Tk.

5,206.81

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

332.35

 

 

 

 

Grand Total

=

Tk.

5,539.16

 

 

 

 

Rate per cft

=

Tk.

3,692.77

 

 

 

 

Rate per cum

=

Tk.

130,410.17

 

Say,

Tk.

130,410

.00 per cum

 

 

 

 

 

 

 

 

 

 

 

Item No.- 11.1.3

 

 

 

 

 

 

 

Supply and making door and window frames with seasoned wood

 

 

 

 

 

 

 

Considering 1 No. door frame

 

 

 

 

 

 

 

Considering for door size: 3'-4" x 7'-0"

 

 

 

 

 

 

 

Wood reqd.: (2 x 7'-0" + 3'-4") x 0'-2.5" x 0'-5" = 1.5 cft (finished)

 

 

 

 

 

 

 

= (2 x 7'-0" + 3'-6") x 0'-2.75" x 0'-5.25" = 1.75 cft (gross)

 

 

 

 

 

 

 

For Silkarai

(a) Cost of wood 1.75 cft

@

Tk.

2,490.0

per cft

=

Tk.

4,357.50

  1. Coaltaring: 2 coats 7.5 sft
  2. Labour for making frame

(i) Carpenter 0.75 no

@

@

Tk. Tk.

7.00

600.00

per sft
per day

=

=

Tk. Tk.

52.50

450.00